At course today we started off by marking out the 1st sheet for the flooring. we set up
string lines along the joists at 1250mm and then we blocks to keep the line
straight off the peaces of partical board. after we got the 1st peace nailed
down using 65mm angle grove floorig nails we stung the next peace up next to it and
carryed on right down to the other end. once we got to the far end of
the house we turned around and went back the other way so that we could stagger
the joints. the peaces were joined in tounge and groove pattern. each peace had
to be glued along the joists with gorilla grip express glue.
http://www.holdfast.co.nz/pages/product_details.aspx?pid=20075&psid=20075
nailing
for the flooring had to be nailed in at 150mm spacing around the outside and
200mm spacing throuhg the middle.
hand tools used :
-hammer
-knife
-square
-pencil
-8mtape
power tools used :
-nail gun
-skill
saw
No comments: