At work experience today we used a digger to dig 3 holes that were 2.2 meters deep and then craned in 3 poles that were 280 mm diameter s e d poles for the support of a hay shed. When we were craning them in we used a string line off the corner post that was already in to get the exact depth the poles needed to be. Then we used sol plates to hold the poles steady while we braced them up using spear timber a nail gun pegs sledgy and a straight edge spirit level. Tomorrow we are going to poor 1 meter of concrete in each hole to support the poles so the don't sink  and to make them permanent. Then once the concrete is in we will fill the rest of the hole with dirt and the start building the roof